baner
Cari beli tiket pesawat murah online
You are here:   + Info Statistics
National Eletrifikasi 2009 Ratio
National Electrification Ratio 2009 by PLN sources:
National 
65% 
NAD
74%
Sumut
69%
Riau & Kepri 54%
Sumbar
68%
Jambi
49%
Bengkulu
50%
Lampung
48%
Sumsel
50%
Babel
72%
Jakarta
100%
Banten
72%
Jabar
65%
Jateng
71%
Yogya
80%
Jatim
71%
Bali
74%
NTB
32%
NTT
24%
Kaltim
63%
Kalteng
44%
Kalbar
46%
Kalsel
71%
Sulut
67%
Gorontalo
49%
Sulteng
48%
Sulsel
55%
Sultra
38%
Malut
48%
Maluku
55%
Papua
32%
Production and electricity consumption data (data from the Department of Energy)

 

Production (GWh) Consumption (GWh)
2002       
180.192
87.409
2003
113.019 90.439
2004
120.244 99.425
2005
124.449 107.031
2006
126.168 112.609
2007
141.711
121.554
2008
149.329
129.018
2009
115.714 99.817
Electricity Financing Requirement (in USD. Trillion)
PLN needed Investment Source of Cost
2009       
-64
59
2010
-83 46
2011
-78 24
2012
-77 24
2013
-77 112.609
2014
-69
121.554
2015
-65
129.018
2009
63 99.817

 

Capable of Power
Peak Load 
Balance 
Sumbagut 1.250,2
1.227,5
22,7
Sumbagsel-teng
1.563,3 1.727,0
-178,7
Kep. Riau 34
38
4,3
Belitung
20 15
4,75
Jamali
20,587
16,580
4,007
Lombok
90,56
90,46
0,10
Kupang
24
25
1,5
Pontianak 141,9
131
10,9
Pangkalan Bun
16
14
2,23
Barito 252,59
311,76
-59,17
Mahakam
214
213
1,08
Sulsel
524
505,97
18,03
Kendari
33
36
-3,5
Palu
40
50
-10
Minahasa
171,7
146,4
25,3
Ambon
31 31
0
Ternate
15 14 0,58
Sorong 18
19,8
-1,8
Jayapura
40
39
0,3

Marubeni and Mitsui will merealiasasi 1400 MW of electricity worth U.S. $ 1.4 billion in 2010. News on Bisnis Indonesia.

This means USD. 14.000.000.000.000 (in U.S. $ 1 = Rp. 10 000) to produce 1.4 billion, equivalent to one watt. 140 000 rupiah.